    The short answer

    Build the number room by room rather than as an average. Take £450 fitted as the base for a standard casement, add for the bay, add for opener count and glass, and subtract for fixed lights. That gives a total you can actually interrogate.

    Walk the house and count openings properly

    Count openings, not rooms. A front bay is one opening even though it has three or four frames. A landing window is an opening even though it is small. Note which ones you actually open, because that single note is the biggest saving available to you.

    Then mark the bedrooms. At least one window per bedroom normally needs to be an escape sized opener, and that requirement is not negotiable regardless of what you would prefer.

    Typical semiOpeningsNotes that move the price
    Front bay, lounge1 structural jobSupport at the head, sill and roof detail
    Rear lounge or dining1 to 2Often the largest single sashes
    Kitchen1Frequently needs a top opener only
    Bedrooms2 to 3One escape opener each
    Bathroom1Obscure glass, often small
    Landing and hall1 to 2Fixed lights keep the cost down

    The four decisions that move the total

    First, the bay. Including or excluding it can swing the total more than any other single decision, because it is a structural operation with propping, sill and roof detailing rather than a window swap.

    Second, opener count across the whole house. Third, colour, because a foil or powder coat applies to every unit rather than one. Fourth, glass upgrades, which should be targeted at specific rooms rather than applied across the board.

    Phasing, and when it makes sense

    Doing everything at once is cheaper per window because the access, the setup and the making good are shared. But phasing is perfectly reasonable if the alternative is not doing it.

    If you phase, do it by elevation rather than by room, so the house never looks half finished from any one viewpoint. Front elevation first is the usual order, and we record the exact specification so the second phase matches years later.

    • Front elevation first, since it sets the appearance and often the worst draughts
    • Keep the colour and profile reference on file for matching later
    • Do the bay with the front elevation, not separately, because of the access
    • Leave fixed lights and the landing until last, they are the cheapest per opening

    Price your whole house properly

    We survey every opening, itemise the quote and give you one fixed figure that includes the bay, the making good and the certificate.

    Costs & pricing — common questions

    Get a Free Written Quote

    Tell us what you need and our Leicester team will provide a clear, no-pressure quote.

    ✓ 40+ years local ✓ 10-year insurance-backed guarantee ✓ Free no-pressure survey