Process & timings 8 min read

    From first call to finished job — the whole process

    Most of the anxiety around replacement doors and windows comes from not knowing what happens next. This is the whole sequence, in order, with what's expected of you at each point.

    The short answer

    Six stages: enquiry, free home survey, technical measure, manufacture (typically 2–4 weeks), installation day, then certification and guarantee paperwork. You need to be in for the survey and the fit; everything else happens without you.

    Stage 1 — Enquiry and rough guide price

    A phone call or the quote form is enough to establish what you're replacing and roughly what it costs. We'll give you a realistic band at this point rather than an artificially low number designed to get us through the door.

    Stage 2 — Free home survey

    We come out, look at the actual openings, bring physical colour and hardware samples, and talk through options. Allow around 45 minutes for a single door and up to two hours for a full house of windows.

    You get a written, itemised quote. There is no same-day-only discount and nobody phones a manager.

    • Have a rough idea of which openings you want done first
    • Mention any known issues — damp, movement, a previous bodged repair
    • Tell us about conservation area status or a listing if it applies
    • Ask to see the guarantee wording

    Stage 3 — Technical measure

    Once you accept, we re-measure to manufacturing tolerance. This is a separate, more precise visit than the sales survey because a made-to-measure product can't be adjusted later.

    Stage 4 — Manufacture

    Typically two to four weeks depending on the product and finish. Standard white PVCu is quickest; foiled colours, heritage profiles and special glass take longer. We give you a date range at order and a firm date once the units are in.

    Stage 5 — Installation day

    Dust sheets down, old unit out, new unit in, sealed, adjusted and demonstrated. A single door is usually a half-day. A full house of windows is typically two to three days.

    You'll need clear access to the inside of each opening and somewhere for us to park within reasonable carrying distance.

    Stage 6 — Certification and guarantee

    Replacement windows and external doors are notifiable work under Building Regulations. As a FENSA-registered installer we self-certify and the certificate follows the job. Keep it with your deeds — you'll be asked for it when you sell.

    Book a survey with no sales pitch attached

    Free and with no obligation. We provide an initial quote first so you know the price before anyone comes to measure. After a free measured survey confirms the door or window specifications, design and requirements, we send a final written quotation for your approval.

    Process & timings — common questions

    Get a Free Written Quote

    Tell us what you need and our Leicester team will provide a clear, no-pressure quote.

    ✓ 40+ years local ✓ 10-year insurance-backed guarantee ✓ Free no-pressure survey