What 'fitting' should include
Fitting is not just hanging a slab. On a straightforward external door replacement the labour covers removing the old door and frame, checking the opening is square and the lintel is sound, packing and fixing the new frame plumb, fitting and adjusting the multi-point lock, sealing inside and out, and making good the reveal.
Disposal matters more than people expect. An old timber door and frame is bulky waste; a PVCu frame with sealed units is heavy. If a quote is silent on disposal, ask.
- Removal of the existing door and frame
- Checking and, where needed, packing the opening square
- Fixing and sealing the new frame inside and out
- Fitting, adjusting and testing the locking mechanism
- Making good plaster, render or brickwork at the reveal
- Removal and disposal of all old materials
- Clean-up and a working demonstration before we leave
What pushes fitting labour up
Access is the biggest single factor. A first-floor balcony door, a door reached only through a narrow side passage, or a property on a busy road with no parking all add time.
Structural surprises are second. A rotten timber lintel, a sagging opening on a Victorian terrace or a previously-bodged install with expanding foam instead of packers all mean remedial work before the new frame can go in.
| Situation | Typical effect on labour |
|---|---|
| Straight swap, ground floor, good access | Baseline |
| Opening out of square by more than 10mm | Add half a day |
| Lintel repair or replacement needed | Add a day, plus materials |
| Brick opening being altered in size | Add a day, plus making good |
| Restricted access / no parking | Add 1–2 hours |
How to compare two quotes fairly
Put both quotes on the same basis before comparing the bottom line. Ask each installer, in writing, whether the price includes removal, disposal, making good and the certificate — and whether the deposit is protected.
A cheaper headline number with three exclusions is usually the more expensive job.