Process & timings 5 min read

    How long does it take to fit a front door or new windows?

    People plan around the fitting day and forget the manufacturing lead time. In practice the on-site work is short and the waiting is long. Here's what each part realistically takes.

    The short answer

    Fitting a front door usually takes around half a day on site. A typical three-bed house of double glazed windows takes two to three days. The longer wait is manufacture beforehand, normally two to four weeks, because every door and window is made to measure after the survey.

    On-site timings

    These are working times for a straightforward replacement into an existing opening with reasonable access.

    JobTypical time on site
    Single composite or PVCu front door3–5 hours
    Back door with a cat flap or pet door4–6 hours
    French doors into an existing opening5–7 hours
    Patio / sliding doorMost of a day
    Single window1.5–3 hours
    Three-bed house, full window replacement2–3 days

    What makes a job overrun

    Almost always something hidden behind the old frame: rot in a timber lintel, a cavity closer that was never fitted, or a previous installation packed out with foam rather than solid packers.

    We'd rather flag it and take an extra half-day than fix a frame into something unsound. If we find it, we show you before we carry on.

    Planning around the work

    For a full window replacement, clear a metre of floor in front of each window and take pictures and shelves off the surrounding walls. Curtains and blinds need to come down.

    Pets are the most common complication — doors are open and closed repeatedly, so plan a room they can be shut into.

    • Clear one metre of floor in front of each opening
    • Take down curtains, blinds and nearby wall fixings
    • Plan a safe room for pets on fit day
    • Reserve parking close to the property if you can
    • Expect drilling noise in bursts, not constantly

    What happens during a half-day door fit

    The old door and frame come out, the opening is checked and cleaned, the new frame is fixed and packed square, the door is hung and adjusted, and the frame is sealed inside and out. The last part of the visit is testing the locks with you and handing over the keys.

    Your home is never left without a lockable door: the old one stays in until the new frame is ready to go in.

    Why windows take longer

    Each window is a separate removal, fit and seal, and bay or large openings take longer than a simple casement. We work room by room so each opening is closed up before moving on, which keeps disruption to one area at a time.

    Get a date, not a vague window

    We confirm a firm fitting date once your units are in stock, and we ring the day before.

    Process & timings — common questions